Morocco Yellow Pages Online
Home » Products »  seismic truck drilling rig for oil prospecting

seismic truck drilling rig for oil prospecting

Add Review
Price : On Request



1 Technique description and performance:TST-150 Drilling rig are designed with air, mud and air hammer drilling. It is applicable for seismic prospecting in complex stratum area such as Gobi, desert, river bed and gravel etc. Mainly uses imported components. It is mounted on 4X4 or 6X6 off-road chassis with steady performance, low maintenance cost and easy to operation. It can carry out liquid normal circulation and air normal circulation etc. many kinds of drilling methods. Adopts full hydraulic drive, central control, facilitate operating and reliable. Power takes from the chassis engine. After changing in transfer case, power of chassis engine will be sent to hydraulic system of drilling rig, air compressor and mud pump. Mud pump and air compressor are controlled by one clutch separately. Install un-directional valve on air pipeline to prevent mud getting into air compressor system. Drilling rig system works by two hydraulic variable pump work through series-parallel connection. Power swivel uses double speed motor driving with big rev and torque scope. It has a broad applicability. Top-driving improves drilling efficiency highly. End frame at end part is leveled through hydraulic system. Pulldown speed control system of drilling rig has the function of self-adapting to stratum. It doesn’t need manpower non-stop operating down hydraulic level. Drilling system can carry out possible max speed to do drilling according to stratum situation. Specially designed two pieces of hoisting chains auto equalizer can improve the system’s security and reliability. Drilling rigs meet QHSE requirements. Chassis chosen for drilling rig include: Tiema China, Shatuo China and SHANXI automobile China.

www.drillingrigts.com

[email]

  • Product Details
  • Brand :
  • Place of Origin : China
  • FOB Price : On Request
  • Minimum Order Quantity : Not Given
  • Supply Ability :
  • Packaging & Delivery
  • Packaging Detail : Not Given
  • Delivery Detail : Not Given
 Main technical parameter of drilling rig:1, Optimum working ambient temperature: -10~40℃.2, Optimum working altitude height: lower than 2000meters.3, Drilling method: air/air ha